Resources

Read up. Or skip ahead.

Briefings for buyers. Framework primers for analysts. Technical notes for the engineering-curious. The full deliverable pack is being prepared for publication — drop us a note for early access in the meantime.

Weblink HTML dashboard — a real Risk Studio output deliverable
Live deliverable previewA real Risk Studio Weblink dashboard — interactive S-curve, drill-down findings, print-ready. Sample pack publishing Q3 2026.
Live now · more landing Q3 2026

The live Weblink sample is open. The full pack lands Q3.

A real Risk Studio Weblink output is published at riskstudio.somaprojectcontrols.com/samples/weblink/. The rest of the pack — sales brochure, Analyst Briefing deck, framework one‑pagers — arrives in Q3 2026, properly versioned and traceable to the product release.

Need a draft before then? Email us and we'll share the latest internal version with the caveats attached.

Briefings

Read in under 10 minutes.

PDF · 6 pages

SOMA Risk Studio — Sales brochure V1

The product story end to end. Problem, modules, frameworks, defensibility, pricing. Designed for an exec audience.

Coming Q3 2026
PDF · 12 pages

Analyst Briefing PPTX — sample

The 12-slide briefing deck Risk Studio generates per scheme per period. Read the speaker notes — addressed to PM, Planner, Risk Manager, RAM, RRM.

Coming Q3 2026
HTML

Weblink Dashboard — live sample

A real Risk Studio output deliverable. Self-contained HTML, interactive S-curve, drill-down panel, print-ready.

Open sample
Framework primers

One-page explainers for analysts and clients.

PDF · 1 page

SOMA QSRA Readiness V2.6

33 checks, 5 domains. What each domain covers and why.

Coming Q3 2026
PDF · 1 page

DCMA 14-Point Assessment

The 14 checks, default thresholds, what passes a sound schedule.

Coming Q3 2026
PDF · 1 page

CIOB PP21

The five sections of the Chartered Institute of Building planning protocol.

Coming Q3 2026
PDF · 1 page

Acumen Fuse SQI

16 metrics combined into a single Schedule Quality Index score.

Coming Q3 2026
Technical notes

For the engineering-curious.

Monte Carlo engine

Higham PSD correction, NORTA correlated sampling, six AACE distributions, Spearman tornados, convergence diagnostic.

Coming Q3 2026

Per-decile risk attribution

Why P10 drivers differ from P80 drivers — and how Risk Studio surfaces that honestly without overstating granularity.

Coming Q3 2026

Audit-replay chain

HMAC-chained log + cryptographic per-run hashes. How byte-identical re-runs are guaranteed across processes.

Coming Q3 2026

Safran comparability

How we validate internal MC outputs against Safran. What "within tolerance" means, and how we publish the variance.

Coming Q3 2026

Schedule Lens rendering

Time-scaled SVG Gantt. Why 5,869 activities + 10,748 relationships render in 4.3 sec — and how the WBS tree stays smooth.

Coming Q3 2026

Multi-user file locks

How concurrent edits across schemes and periods are coordinated without a server-side database.

Coming Q3 2026
Procurement pack

What your procurement team is going to ask for.

Security & data handling

How Risk Studio handles XER content, risk register data, audit logs. Local-only by default. Optional BYO-Azure deployment with your own keys.

Compliance & assurance

WCAG 2.2 AA conformant. 2,690+ automated tests. Zero audit errors across 80+ versioned releases. Multi-framework regression slice on every build.

Service levels

Email support with one-working-day response. Critical issue response inside four working hours. Configurable per-tier.

Standard contract

SOMA's master services agreement, schedule-of-services template, data processing addendum. Available on request.

Request the procurement pack

A missing primer? A briefing you wish existed?

If your team needs something we haven't written yet — a framework primer, a deeper technical note, a procurement‑facing summary — tell us. If it's a fair ask, we'll write it and add it here.