Risk Studio vs Safran Risk
The incumbent — broad, mature, global. We're narrower and faster on UK schedule risk, but Safran wins on track record, cost‑loaded modelling and vendor maturity.
Teal stripe = Risk Studio wins this row Amber stripe = Safran wins this row
| Dimension | Safran Risk | SOMA Risk Studio |
|---|---|---|
| Safran winsTrack record | 20+ years in production on global infrastructure programmes — thousands of trained users, a deep bench of analysts to recruit from, and an established consultancy ecosystem around the tool. | Six‑month track record on a major UK infrastructure delivery programme. Production‑grade engineering, but young. |
| Safran winsCost‑loaded modelling today | Integrated cost‑loaded scheduling shipped — full QCRA + QSCRA in one tool, in production for years. | Schedule risk today. QCRA (cost) on the roadmap for V1.5; QSCRA (combined) for V2.0+. If you need cost risk now, this is honest grounds to stay on Safran. |
| Safran winsGlobal support footprint | Regional support teams across Europe, the Middle East, North America and APAC. Established training network with public courses and certified resellers. | Single‑team support — direct line to a SOMA risk lead, fast and personal, but no regional bench. Training delivered in‑house or via SOMA Academy. |
| Safran winsVendor maturity for global procurement | ISO 9001, SOC 2 Type II and an established InfoSec posture that a Tier 1 global procurement team will tick off in an afternoon. | Cyber Essentials in progress, ISO 27001 in progress. Honest answer: if you're a global contractor with a hard InfoSec gate today, we're not the easy procurement. |
| Risk Studio winsValidation | Manual — analyst applies the framework checks by hand or buys a third‑party scoring tool. | Four frameworks built in — SOMA QSRA Readiness V2.6, DCMA 14‑point, CIOB PP21, Acumen Fuse SQI. 68 checks across one schedule, every run. |
| Risk Studio winsWorkflow | Export the schedule, import to Safran, build inputs in Safran, run, export outputs. Round‑trips on every revision. | In‑house Monte Carlo — XER stays in‑app, register lives next to it. No round‑trips. |
| Risk Studio winsAudit trail | Safran's own log — captures what was run, when. | HMAC‑chained log with per‑run hash and byte‑identical replay. Regulator‑spot‑checkable. |
| Risk Studio winsSign‑off workflow | Manual outside the tool — typically a Word document and an email chain. | Per‑finding accept‑with‑reason built in, stamped to the audit log. |
| Risk Studio winsUK English deliverables | Mixed — Safran's own UI is US English; reports follow whatever the analyst writes. | UK English throughout — UI, validation messages, reports, briefings. |
| Risk Studio winsDeployment | Windows desktop application, vendor‑managed licensing. | Local install on Mac or Windows, or BYO‑Azure private cloud, or SOMA‑managed. |
| Risk Studio winsPricing model | Per‑seat licence. Ask Safran for current pricing. | From £15k for a fixed‑fee pilot, from £40k/scheme/year for production. No per‑seat charges. |