See the schedule you've been asked to defend.
A time-scaled Gantt with hierarchical WBS, validator stripes, click-to-drill diagnostics, and overlays for every condition that makes a schedule not safe to risk-load.
Every overlay, labelled.

The overlays you need. Where you need them.
Hierarchical WBS tree
Collapsible sidebar with descriptive labels ("KM — Project Key Dates & Summary Activities"), not just codes. Expand or filter to any depth.
Validator stripes
Per-activity stripes coloured by framework. See at a glance which activities fail SOMA's checks, DCMA's, CIOB's or Acumen's.
Critical-path bars
Distinct fill for critical activities. Milestone diamonds for zero-duration tasks. Lock icons for MSO/MFO constraints.
Open-end markers
Activities with no predecessor or successor are flagged inline. Dangling outline. Negative-lag connectors highlighted.
Out-of-sequence indicators
Activities progressing despite incomplete predecessors are tagged. Reportable, fixable, traceable.
Hatch overlay for non‑risk‑loadable
Summaries, milestones, and locked activities are shown with a hatch fill. They never enter the Monte Carlo by accident.
Every diagnostic, every trace, one click away.
Click any bar. A slide-in panel shows the activity record, clickable predecessor/successor lists, and the full diagnostic trace — every check that activity failed, every framework that flagged it.
- Diagnostic trace — failed checks listed with rule ID, severity, and source field.
- Pin issues into an agenda as you go and work through the list with the planner in one sitting.
- Share‑link URL state — share a deep link with filters, WBS branch and pinned issues preserved.
- This is the tab the analyst and planner sit beside each other to use. The whole UI is designed for that conversation.
Reach Schedule Lens however you work.
Inside Risk Studio
Available as a tab on every scheme. Loads the framework's per-check results automatically. Pre-populated WBS tree from the active XER.
Standalone upload
Drop an XER without setting up a scheme. Diagnostic-only mode for quick spot-checks, second opinions, or partner schedules.
Open a real schedule with us.
On a recent opening render of a 5,800+ activity reference scheme we found 84 open ends and 17 negative lags. Bring your XER.