What's in Risk Studio today, and what's coming next.
Risk Studio is module‑organised. Pick what you need today. The rest sits on a published roadmap — and joins the same audit chain when it ships.
Quantitative Schedule Risk
Validation against four frameworks, Monte Carlo without the Safran round‑trip, S‑curves, tornados, narrative reports — the full workflow from input to deliverable.
Read the specSchedule Lens
Time-scaled Gantt with hierarchical WBS, critical path, milestones, open ends, dangling outlines, click-to-drill diagnostic trace.
See it moveInput Validator
Pre-MC data quality. Risk register, correlations, three-point estimates, orphan checks. Five input lanes converging on one editable grid.
How it worksQuantitative Cost Risk
Cost risk register, AACE‑compliant distributions, Monte Carlo. Lifts today's @RISK workflows into the same audit‑tracked engine that powers QSRA.
Roadmap detailCombined Schedule + Cost
Integrated cost-loaded schedule risk modelling. The long-term Safran replacement once the internal MC engine is validated to within tolerance.
Roadmap detailTell us what's slowing you down
We build the next module from real client conversations. Bring a friction point, a deliverable that takes too long, or a check no tool runs today.
Start the conversationOne toolkit, four deliverables, one source of truth.
| Lane | Module | Status | Live in |
|---|---|---|---|
| Schedule risk modelling | QSRA | Live | V1.32 · today |
| Visual schedule diagnostics | Schedule Lens | Live | V0.19+ · today |
| Input data quality | Input Validator | Live | V1.32 · today |
| Cost risk modelling | QCRA | Roadmap | V1.5 · target |
| Combined schedule + cost | QSCRA | Roadmap | V2.0+ · target |
Roadmap targets are real — they're built into the active codebase as placeholder packages (engine/qcra/, engine/qscra/). When QCRA ships, it joins the same audit chain, the same export formats and the same reporting layer. No rip-and-replace.
Bring a schedule we haven't seen before.
We'll route it through every module that fits — Input Validator, QSRA, Schedule Lens — and walk through what came back. No deck, no theatre.